JBR Environmental Consultants, Inc. has completed more than 200 National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA) documents on behalf of numerous federal agencies. Lead agencies and client proponents alike have acknowledged JBR's leadership in the preparation of Environmental Assessments (EAs), Environmental Impact Statements (EISs), Environmental Impact Reports (EIRs), and related documentation required for compliance with the NEPA and CEQA.
JBR’s multi-disciplinary, in-house professional staff includes botanists, wildlife biologists, range specialists, geologists, soil scientists, hydrologists, hydrogeologists, planners, archaeologists, environmental engineers, wetland scientists, geochemists, and air quality experts.
Our NEPA and CEQA related services are comprehensive and include the following:
JBR has provided NEPA and CEQA services on behalf of numerous agencies for projects related to:
![]() |
| Click to view JBR's NEPA & CEQA Compliance brochure |
AT&T On-call Environmental Support within the State of Nevada
JBR provided assistance to AT&T for fiber optic linear projects related to environmental baseline surveys, permitting, and construction monitoring in conjunction with local, state, and federal agencies throughout Nevada.
Read More
a
Beehive Telephone Company Fiber Optic Line Environmental Assessment
JBR prepared an Environmental Assessment for Beehive Telephone Company’s proposed installation of an underground fiber optic line.
Read More
a
I-80 Interchange Environmental Assessment
JBR completed the final Environmental Assessment for a new interchange proposed to connect to Interstate 80 about 12 miles east of Sparks, Nevada.
Read More
Union Telephone and CommNet Cellular Signal Mountain Cellular Tower Project
JBR was asked to prepare an Environmental Assessment for Union Telephone and CommNet Cellular’s proposed renovation of an existing repeater site location on Signal Mountain into a fully-equipped cellular electronic site.
Read More
Bald Mountain Mine North Operations Area Expansion
JBR was instrumental in preparing the Preliminary Draft Environmental Impact Statement for expansion of the Bald Mountain Mine.
Read More
Brush Resources, Inc., Delta, UT
JBR has provided a wide variety of services to the Brush Resources, Inc. beryllium mining and milling operations in southwestern Utah for over 20 years.
Read More
Simplot Smoky Canyon Mine Panels F & G Environmental Impact Statement
For this project, JBR worked with federal agencies to analyze multiple environmental impacts from Inventoried Roadless Areas to impacts on area streams; analyzed Native American treaty rights; and addressed more than 30,000 public comments.
Read More
PacifiCorp/UAMPS St. George Switchyard & 138/345 kV Power Line Upgrade Project, UT
JBR's team of GIS, biology, and NEPA specialists conducted all aspects of the environmental permitting process for a proposed switchyard and transmission line in St. George, UT.
Read More
Garkane Energy 138 kV Line Environmental Impact Statement
JBR is working with the Dixie National Forest as a third-party contractor to prepare an Environmental Impact Statement for a proposed 138 kV transmission line that would provide needed additional power capacity to Hatch, Utah.
Read More
UNEV Pipeline Project Final EIS
JBR Environmental Consultants, Inc. recently completed the preparation of a Final EIS for a 400-mile interstate pipeline for refined petroleum products. The pipeline would connect refineries in North Salt Lake City, Utah to North Las Vegas, Nevada.
Read More
a
Reno ReTrac
From state and federal permitting, to water quality sampling, to preparing a Health and Safety Plan, JBR provided comprehensive services for this ambitious urban development project.
Read More
a
Drum Mountains and Whirlwind Valley Geothermal Exploration Projects, Delta, UT
JBR prepared Operation Plans and an EA and conducted baseline field surveys for cultural resources, wildlife habitats, and special status species for this geothermal exploration project.
Read More
a
NV Energy ON Line EIS (Formerly Ely Energy Center Project), NV
JBR conducted extensive baseline studies to prepare an Environmental Impact Statement for a 230-mile transmission line project in Nevada.
Read More
a
Dixie National Forest Oil & Gas Leasing EIS
JBR prepared the EIS for the Dixie National Forest to document a forest-wide leasing analysis and to disclose the environmental and human effects of oil and gas leasing on lands administered by the largest National Forest in Utah.
Read More
a
GIS Services in Support of the Dixie National Forest Oil and Gas Leasing EIS
JBR created a GIS model for the Dixie National Forest (DNF) to determine sites suitable for oil and gas leasing.
Read More