Since 2003, JBR Environmental Consultants, Inc. has been conducting water quality monitoring and studying Best Management Practice (BMP) effectiveness for the Nevada Department of Transportation (NDOT) on its $440 million, 8-year I-580 Extension Project. NDOT has incorporated state-of-the-art engineering into the highway design in an effort to maintain and improve water quality. Specifically, NDOT will provide permanent on-site stormwater runoff treatment by incorporating structural control measures like water quality basins and sand-oil interceptors. To determine any impacts to waters resulting from implementation of the project, JBR is performing baseline, interim, and post-construction water quality monitoring. This study includes a Baseline Water Quality Assessment; development and implementation of Sampling and Analysis Plans; weather monitoring and stormwater sampling; quarterly surface water monitoring; design, installation, and maintenance of near-continuous in situ turbidity probes; interpretation of water quality analyses related to construction activities; assessment of temporary BMP function during runoff events; and report writing.
Project Contact