Phase I Assessment of Environmental Conditions for Property Transaction
JBR has conducted Phase I ESAs for property transactions covering large and remote acreages proposed for potential mining development.
Read More
Rose & Alder Street Improvements – Cultural Resources Survey, Walla Walla, WA
JBR conducted architectural inventories of historical buildings in downtown Walla Walla as part of a cultural resources survey to evaluate National Register of Historic Places (NRHP) listing eligibility.
Read More
Rosemont Copper Project Air Quality Services for a Class II Permit and in Support of an EIS
JBR conducted a 3-year air quality and meteorological monitoring program to determine background concentrations and the meteorology affecting the dispersion of pollutants and used the data to submit a Class II Air Quality Permit.
Read More
Smith Island Habitat Restoration & Dike Improvements – Cultural Resource Assessments, Snohomish County, WA
JBR provided a cultural resources reconnaissance-level survey for this habitat restoration project requiring U.S. Army Corps of Engineer permit extension.
Read More
Source Emission Testing for a BSVE Unit
JBR conducted initial performance testing and subsequent annual testing of the largest biologically-enhanced soil vapor extraction unit in the United States.
Read More
Source Emission Testing for a Geothermal Project, CA
JBR conducted source emission testing at Cal Energy Operating Company's Imperial Valley Geothermal Generating Project.
Read More
Source Emission Testing for an Energy Facility, AZ
JBR conducted source emission testing at the Calpine Corporation's South Point Energy Center to determine compliance, conduct a RATA audit, and to establish new emissions factors to be used in future monitoring and reporting.
Read More
Thompson Creek Mine EIS & Air Quality Services
Associated with preparation of an EIS, JBR is providing air quality services to TCM including analyzing emissions and ambient impact, and evaluating fugitive dust and all greenhouse gas emissions associated with proposed operations.
Read More
Toxic Release Inventories, Multiple Projects
JBR has performed Toxic Release Inventories (TRIs) for numerous facilities since 1998.
Read More
Tuscarora Geothermal Project, Independence Valley, NV
JBR worked on the Tuscarora Geothermal Project in northeast Nevada obtaining necessary permits, conducting investigations and surveys, and providing support for a variety of other activities at the site.
Read More
Page 3 of 10, 21 to 30 of 96 projects