Home Projects
Filter By Project

Projects

Toxic Release Inventories, Multiple Projects
JBR has performed Toxic Release Inventories (TRIs) for numerous facilities since 1998.
Read More

Corrective Action Technologies Applied at a Large Natural Gas Processing Plant
JBR negotiated a phased, remedial strategy deemed acceptable to the WDEQ and the client to address multiple hydrocarbon releases at a large natural gas processing facility.
Read More

Compliance Audits for Multiple Coal-fired Power Plants
JBR has performed comprehensive environmental compliance audits at more than 10 coal-fired electrical generation power plants in the mountain west region periodically over the last 15 years.
Read More

Delineation of a Fuel Oil Spill From a Tank Overfill
JBR personnel performed Geoprobe® soil boring and on-site analytical services for a fuel spill in Yellowstone National Park, Wyoming.
Read More

Abandonment of Monitoring Wells via Pressure Grouting

Abandonment of Monitoring Wells via Pressure Grouting
JBR performed Geoprobe® injection pump services at three groundwater monitoring wells in Yellowstone National Park, Wyoming.
Read More

Union Telephone and CommNet Cellular Signal Mountain Cellular Tower Project
JBR was asked to prepare an Environmental Assessment for Union Telephone and CommNet Cellular’s proposed renovation of an existing repeater site location on Signal Mountain into a fully-equipped cellular electronic site.
Read More

Yellowstone Park Service Station Environmental Assistance

Yellowstone Park Service Station Environmental Assistance
For this major project, JBR provided multiple environmental services, from writing a Spill Prevention Control and Countermeasure (SPCC) plan, to design and installation of an above ground storage tank system, spill pad and fuel station upgrade.
Read More

Page 1 of 1, 1 to 7 of 7 projects

|